নল-চৌবাচ্চা ও কাজ
1. A can do a piece of work in 14 days which B can do in 21 days. They begin together but 3 days before the completion of the work, A leaves off. The total number of days required to complete the work is -
Ai এর মাধ্যমে
১০ লক্ষ+ প্রশ্ন ডাটাবেজ
প্র্যাকটিস এর মাধ্যমে নিজেকে তৈরি করে ফেলো
উত্তর দিবে তোমার বই থেকে ও তোমার মত করে।
সারা দেশের শিক্ষার্থীদের মধ্যে নিজের অবস্থান যাচাই
If 10 men can do a piece of work in 12 days, the time taken by 12 men to do the same piece of work will be:
A Pipe P can fill a tank in 16 minutes and the other pipe Q can empty the whole tank in 32 minutes. If both P and Q are opened simultaneously then the time taken to fill the tank is -
Working alone, Protik takes complete April to build a pavement. His friend Mahmud is 25% faster than him at the same work. Working alone, how many days will Mahmud take to build the same pavement?
Time taken by A to finish a piece of work is twice the time taken B and thrice the time taken by C. If all three of them work together, it takes them 2 days to complete the entire work. How much work was done by B alone?