নল-চৌবাচ্চা ও কাজ
1. Twelve children take sixteen days to complete a work which can be completed by eight adults in twelve days. Sixteen adults started working and after three days ten adults left and four children joined them. How many days will they now take to complete the remaining work?
Ai এর মাধ্যমে
১০ লক্ষ+ প্রশ্ন ডাটাবেজ
প্র্যাকটিস এর মাধ্যমে নিজেকে তৈরি করে ফেলো
উত্তর দিবে তোমার বই থেকে ও তোমার মত করে।
সারা দেশের শিক্ষার্থীদের মধ্যে নিজের অবস্থান যাচাই
If 10 men can do a piece of work in 12 days, the time taken by 12 men to do the same piece of work will be:
A Pipe P can fill a tank in 16 minutes and the other pipe Q can empty the whole tank in 32 minutes. If both P and Q are opened simultaneously then the time taken to fill the tank is -
Working alone, Protik takes complete April to build a pavement. His friend Mahmud is 25% faster than him at the same work. Working alone, how many days will Mahmud take to build the same pavement?
Time taken by A to finish a piece of work is twice the time taken B and thrice the time taken by C. If all three of them work together, it takes them 2 days to complete the entire work. How much work was done by B alone?