কাজ

Water is dragged from a well of hepth 30 m using bucket of weight 50kg with water If the weight of the rope is 0.4 kg per metre, the amount of work done is ;

হানি নাটস

Given

Depth of well =30 m =30 \mathrm{~m}

weight of bucket + water =50 kg =50 \mathrm{~kg}

mass per unit length of rope =0.4 kg =0.4 \mathrm{~kg}

mass of length x+ x+ mass of bucket + weight = = (0.4x+50)kg (0.4 x+50) \mathrm{kg}

weight of rope +( +( bucket + water )=(0.4x+50)g )=(0.4 x+50) g work done in lifting the rope t t bucket + water by dx= d x=

(0.4x+50)gdx (0.4 x+50) g d x

Total work done in lifting from

0 to 30m=030(0.4x+50)gdx=0.4gx22+50xg030=0.2g×30×30+50×30×g=0.2×900×9.8+1500×9.8=1764+14700=16464 J0ule  \begin{aligned} 0 \text { to } 30 m & =\int_{0}^{30}(0.4 x+50) g d x \\ & =0.4 g \frac{x^{2}}{2}+\left.50 x g\right|_{0} ^{30} \\ & =0.2 g \times 30 \times 30+50 \times 30 \times g \\ & =0.2 \times 900 \times 9.8+1500 \times 9.8 \\ & =1764+14700 \\ & =16464 \text { J0ule } \end{aligned}

Hence, the amount of work done is 16464 J

কাজ টপিকের ওপরে পরীক্ষা দাও